DragonBoard structural subfloor for construction professionals
FOR STEEL FRAMING CONTRACTORS

Add the subfloor to your scope. Same crew. Same tools. More revenue per project

DragonBoard installs with a circular saw and a screw gun on the cold formed steel joists you already framed. Take the deck scope back from the gypcrete sub, control your project schedule, and add revenue per square foot.

THE SOLUTION

A dry, fire-rated panel that installs with the crew you already have.

DragonBoard is an MgO structural subfloor panel certified to UL Design G575 per ASTM E119. It ships in 22-panel skids, booms directly onto your floors, and installs with circular saws and screw guns — same crew, same trade, same scope.

  • Zero cure time — finish trades start same day
  • 60–70% lighter than gypcrete
  • $0.50–$1.50 lower installed cost per SF
  • No weather dependency, install year-round
THE STEEL CONTRACTOR ADVANTAGE

Built around how steel framers actually expand a project scope

Scope Expansion Without Tools or Training

Standard circular saw and screw gun. Grabber CGH8185LG fasteners on a standard pattern. No specialized equipment, no new certifications. Your existing crew is productive on day one.

Revenue Per Project

Subfloor scope adds material and labor revenue your crew already has capacity for. More dollars per project from the same field hours.

A Schedule You Control

No waiting on a gypcrete sub, a pump truck, or a cure window. Your crew installs the deck as part of the framing sequence. The next trade starts when you finish.

One Source for the Structural Shell

DragonBoard plus Super Stud cold formed steel framing means you bid the entire structural shell from one supplier. Joists, track, studs, subfloor. Simpler procurement, integrated technical support.

MgO Benefits

Built for how your crew already works.

DragonBoard installs with circular saws and screw guns — no wet trades, no cure windows, no second mobilization. The same framing crew that builds the floor installs the subfloor.

Icon: insect resistant

Zero cure time

Finish trades start the same day the panel goes down. No waiting, no sequencing delays, no lost days on the critical path.

Icon: flame retardant

Non Combustible

UL G575 exclusive 2-hour fire-rated assembly per ASTM E119. Same code compliance as gypcrete, zero cure window.

Icon: water resistant

60–70% lighter

4 lbs/SF vs. 10–15 lbs/SF for gypcrete. Less dead load on your structure, lighter lifts for your crew.

Icon: sustainable, zero VOCs

Weather independent

No temperature minimums, no rain delays. Install year-round on any floor, any condition.

WHAT'S LIMITING YOUR MARGIN

Commodity products get commodity margins.

Three reasons your current subfloor line isn't building the margin your business needs.

Icon: drywall margins
8–12%

What drywall actually returns

Commodity drywall gets price-shopped on every order. No spec protection, no lock-in, and no reason for the contractor to stay loyal to your branch.

Icon: customer demand
No pull-through

Products your customers don't ask for

Without architect specification, you're selling on price. DragonBoard flips that — architects specify it by UL design number and GCs pull it through your branch.

Icon: OSB and lumber price swings
Cyclical demand

OSB and lumber swings hurt

Commodity subfloor margins track lumber cycles. DragonBoard's spec-driven demand is structurally insulated from commodity price pressure.

DragonBoard MgO subfloor installation diagram

Backed by 50+ years of steel framing expertise

DragonBoard is backed by Super Stud Building Products, trusted by contractors, architects, and dealers since 1973. When you specify DragonBoard, you're working with the team that supplies the steel framing underneath it.

Learn About Super Stud
YOUR PILLARS

What the DragonBoard line does for your branch.

01

Margin

18–25% on a spec-protected product vs. 8–12% on commodity drywall. Holds without discount pressure.

02

Spec Pull

Architects specify UL G575 by name. Your branch captures the fulfillment — demand generated upstream.

03

Stocking

Ships on standard skids. Stores in standard racking. First-order incentive available on initial pallet.

04

Support

Sales kit, co-branded collateral, team training, and project leads routed directly to your branch.

FAQs

Quick answers to the questions steel framing contractors ask before they add the subfloor scope. Don't see yours? Reach out and we'll get you what you need.

contact us
Do I need special tools to install DragonBoard?

No. All three panels can be installed using standard tools: a circular saw with a carbide-tip blade and a screw gun. The panels measure 4' × 8', with a shiplap edge along the 8' side. Structural Subfloor and MAG X-24 install directly to the framing, while InfernoBloc installs over plywood, OSB or MgO subflooring. Use #8 screws (refer to the Installation Guide for specifications), with Grabber CGH8185LG fasteners spaced 6” along the edges and 12” in the field. Panels ship 22 per skid and can be boomed directly to the floor. For detailed installation instructions, refer to the Installation Guide.

Installation Guide ↓
Can you use DragonBoard over steel and wood framing?

Yes. Structural Subfloor installs directly to steel or wood framing, and MAG X-24 installs over wood or steel trusses and joists. Use UL G575 for CFS assemblies and UL L583 for wood.

What framing spans and load capacities does MAG X-24 support?

MAG X-24 is an 18 mm structural MgO subfloor product with engineering data for framing spaced at 16”, 19.2”, and 24” o.c. Values for 19.2” and 24” o.c., are currently identified as preliminary engineering values under Intertek Report No. 250218008SHF-002. Allowable spans depend on project loads, framing conditions, and applicable approvals. Consult DragonBoard technical documentation and the project engineer before specifying.

What is the load capacity of the Structural Subfloor?

At 16” o.c., board capacity is 393 psf at L/240 and 257 psf at L/360. These are ultimate capacities, not reduced by safety factors, based on NTA testing to ASTM C1185, Section 5.

10,000 SF 25,000 SF 50,000 SF 100,000 SF 250,000 SF
Area in square feet 100,000 SF
Cost using wet pour floor $550K
Cost using DragonBoard $450K
Schedule recovery 14–21 days
Money saved: $100K

Estimates based on typical Northeast corridor mid-rise projects. For a project-specific analysis, use the full ROI Calculator.

READY TO RUN THE NUMBERS

See what DragonBoard saves on your next project

Calculate the cost and schedule impact for your project parameters, or request a sample with full UL test data and submittal package.

READY TO SPECIFY

Contact Us

Ready to bring DragonBoard to your next project? Reach out to our team for quotes, technical support, or distributor information.